704-888-2386 • 103 W Stanly Street, Stanfield, NC 28163

Pete Henkel Park Bathroom Renovations

Bathroom renovations are underway at Pete Henkel Park.  During construction, visitors can use the port-o-john located down the paved walking trail near the picnic shelter.  Please excuse the mess as we update old and add new facilities at Pete Henkel Park.

ZONING BOARD MEMBERS NEEDED

Interested in serving on the Planning and Zoning Board for the Town of Stanfield?  Two positions are open.  One position is In-town Alternate (must live in the town limits of Stanfield).  The second position is ETJ Alternate (must live in the extra-territorial...

Resident Limb Pickup – March 18

Resident Limb Pickup is Saturday, March 18.  Please no longer than 6 ft and no bigger than 3 in diameter. No stumps or logs. Place next to the street. Next opportunity April 2023 – Inside Town residents may drop off limbs at the burn pile at Pete Henkel Park...